Shangjin Steel Fabrication

Shangjin Steel Fabrication|Completed
Shangjin Steel Fabrication|The fully clad partition wall, with the work area visible through the opening
01 / 02
Completed

A metal panel partition wall inside an existing factory, framed in light-gauge steel and clad in metal panels, with an opening left through to the work area.

Project notes

This project added a partition wall inside an existing factory. The wall frame and door opening were first put up in silver light-gauge steel members, then vertically ribbed metal panels were laid on the outside of the frame. The photos show the stage when the frame had just gone up and the upper half was clad, and also the wall fully clad with the opening left. During the work, goods and large rolls of material were still stored in the work area behind the wall.

Need a steel structure of a similar scale?

Tell us your site location, intended use and floor area. Within two working days we will reply with a preliminary estimate of steel tonnage and schedule.

  • Phone +886-4-768-8550
  • Address彰化縣秀水鄉番花路 300 巷 30 號 1 樓
  • HoursMon–Fri 08:00–17:00 (Taiwan time, GMT+8)
  • Tax ID28494320