English
Chat on LINE
Aerial view of a TEI-JEN-GANG project

We build every building
twice.

First in Tekla, where every member, every bolt hole and every weld line is modeled in place. Then in steel, cut, drilled, welded and erected from that same data.

Selected Works

Portfolio

One set of data, three stages

Model → Fabricate → Erect
Stage 01: Detailing
Stage 02: Fabrication
Stage 03: Erection

01

Detailing

Modeled in Tekla Structures, with clash checks and connection reviews finished before any drawing is issued. Drawings and model share one source, so a change in one place updates everything.

LOD 400Clash detectionMEP coordination

02

Fabrication

A DAITO processing line imported from Japan works alongside laser cutting. Weld positions and piece marks are etched during cutting, so assembly needs no manual layout.

DAITO lineLaser cuttingWeld-line marking

03

Erection

Members ship and go up in batches by piece mark, in an erection sequence already rehearsed in the model.

Batched deliveryErection simulationNo field rework

One set of data, three stages

Model → Fabricate → Erect
Stage 01: Detailing

01

Detailing

Modeled in Tekla Structures, with clash checks and connection reviews finished before any drawing is issued. Drawings and model share one source, so a change in one place updates everything.

LOD 400Clash detectionMEP coordination
Stage 02: Fabrication

02

Fabrication

A DAITO processing line imported from Japan works alongside laser cutting. Weld positions and piece marks are etched during cutting, so assembly needs no manual layout.

DAITO lineLaser cuttingWeld-line marking
Stage 03: Erection

03

Erection

Members ship and go up in batches by piece mark, in an erection sequence already rehearsed in the model.

Batched deliveryErection simulationNo field rework

Our Philosophy

Philosophy & Governance

A building is a plan
for a hundred years.

Behind every blueprint is a client's life savings or a company's foundation for generations. We don't just put up buildings; we help build dreams and protect livelihoods.

Standard

Built as if we lived there

We hold ourselves to an ever-rising standard and inspect every building we touch as if it were the one we would live in.

Client

A trust, not just a contract

At TEI-JEN-GANG, taking on a project is not signing a contract. It is accepting a trust.

Supply chain

In the same boat, not just buying and selling

Our suppliers and subcontractors are not across the bargaining table; we are in the same boat. Schedule and quality are never one side's job.

Ichigo ichie — one chance, one meeting

The Analects of Confucius say: "Wishing to establish himself, he helps others establish themselves; wishing to succeed, he helps others succeed." Our highest goal is that every finished project leaves us with a friend for life.

Milestones

Since 1996
1996
Haoshun Engineering founded

Our predecessor, Haoshun Engineering, started with three employees.

2006
Renamed

Renamed TEI-JEN-GANG Engineering Co., Ltd.

2010s
Focused on Taiwan

Step by step, we built up experience across hundreds of projects.

2020s
Expanding overseas

Took on a turnkey factory project in Thailand.

Planning a steel structure project?

Tell us the site location, intended use and floor area. Within two working days we will reply with a preliminary estimate of steel tonnage and schedule.

  • Phone +886-4-768-8550
  • Address彰化縣秀水鄉番花路 300 巷 30 號 1 樓
  • HoursMon–Fri 08:00–17:00 (Taiwan time, GMT+8)
  • Tax ID28494320