English
Chat on LINE

08 / FABRICATION

Jiacheng Steel Fabrication Project

Jiacheng Steel Fabrication Project|Completed
Jiacheng Steel Fabrication Project|Steel plate and welds added to the side of a steel column, with the existing services still attached to the column
Jiacheng Steel Fabrication Project|Close-up of the welds on the column, with a worker by the column base
01 / 03
Completed

On-site steel welding inside an existing building, adding steel plates to the sides of steel columns and welding the steel beam connections beneath the floor.

Project notes

This project is on-site steel welding inside an existing building. The floors consist of green steel beams and steel deck, and workers stand on scaffolding to weld at the beam connections. Steel plates are also welded onto the sides of the steel columns, with the welds running along the edges of the column, and the existing pipes and conduits on the columns left in place. All the photos are records from during construction.

Need a steel structure of a similar scale?

Tell us your site location, intended use and floor area. Within two working days we will reply with a preliminary estimate of steel tonnage and schedule.

  • Phone +886-4-768-8550
  • Address彰化縣秀水鄉番花路 300 巷 30 號 1 樓
  • HoursMon–Fri 08:00–17:00 (Taiwan time, GMT+8)
  • Tax ID28494320