08 / FABRICATION
Xinying Steel Fabrication

Completed
Steel frame erection on site. Gray H-beam columns are standing, and a crane is lifting a red platform with railings between them.
Project notes
A steel fabrication and on-site installation project carried out in 2020. In the photos, gray H-beam columns are already standing, some column tops are connected to sloping roof beams, and horizontal purlins are fitted between the outer columns. A crane is lifting a red platform with railings on slings, with workers standing on the platform. Steel beams waiting to be lifted lie on the ground; the site is at the steel erection stage.
Need a steel structure of a similar scale?
Tell us your site location, intended use and floor area. Within two working days we will reply with a preliminary estimate of steel tonnage and schedule.