Qianyu Steel Fabrication



Completed
A steel-framed floor of H-beam columns and beams, with steel deck flooring and a steel stair between levels.
Project notes
A steel fabrication and on-site installation project carried out in 2017. In the photos, the main structure consists of H-beam columns and beams with bolted beam-column connections, steel deck laid as the base of the floors, and a steel stair connecting the levels. When the photos were taken, the steel deck on the upper floor was still being laid, and brick walls had already been built below.
Need a steel structure of a similar scale?
Tell us your site location, intended use and floor area. Within two working days we will reply with a preliminary estimate of steel tonnage and schedule.