English
Chat on LINE

06 / FARM

Yuanpu Beam Replacement Under a Water Tower

Yuanpu Beam Replacement Under a Water Tower|Completed
Yuanpu Beam Replacement Under a Water Tower|A worker on a ladder platform working on a new steel beam, with sparks flying
01 / 02
Completed

Beam replacement under a water tower: new steel beams installed between existing steel columns indoors, replacing the old members that carried the tower.

Project notes

Beam replacement under a water tower, carried out in 2023, indoors. In the photo, new steel beams are being installed between the existing steel columns, with rusted old members visible above. A worker stands on a working platform set up on ladders, and sparks fly as the work goes on. The photo shows the site during construction.

Need a steel structure of a similar scale?

Tell us your site location, intended use and floor area. Within two working days we will reply with a preliminary estimate of steel tonnage and schedule.

  • Phone +886-4-768-8550
  • Address彰化縣秀水鄉番花路 300 巷 30 號 1 樓
  • HoursMon–Fri 08:00–17:00 (Taiwan time, GMT+8)
  • Tax ID28494320