04 / PUBLIC WORKS
Doumei Sanwangfu Temple Steel Fabrication Project



H-beams laid out on the ground, with workers on the steel frame behind
Steel work beside a temple. Red-brown H-beam columns and beams rise along the existing temple wall, with a steel staircase below; the photos were taken during assembly.
Project notes
This is steel work beside a temple. The structure consists of red-brown painted H-beam columns and steel beams rising along the existing temple wall, with the column bases fixed on base plates and a steel staircase below. In the photos the steel frame is still being assembled, safety netting is hung overhead, steel beams are laid out on the ground, and workers are working on the frame.
Need a steel structure of a similar scale?
Tell us your site location, intended use and floor area. Within two working days we will reply with a preliminary estimate of steel tonnage and schedule.
- Phone +886-4-768-8550
- Address彰化縣秀水鄉番花路 300 巷 30 號 1 樓
- HoursMon–Fri 08:00–17:00 (Taiwan time, GMT+8)
- Tax ID28494320