04 / PUBLIC WORKS
Xinxing Factory (Buddhist Hall) Steel Fabrication



Completed
New steelwork inside an existing factory building, with metal sheets laid on green H-beam columns and beams, and steel stairs.
Project notes
Steelwork carried out inside an existing factory building. The new structure is made of green-painted H-beam columns and beams, with bolted beam-column connections, and includes steel stairs. In the photos, metal sheets have been laid on the beams with cutouts left at the columns, and scaffolding and bundled materials are still inside, so the work is in progress.
Need a steel structure of a similar scale?
Tell us your site location, intended use and floor area. Within two working days we will reply with a preliminary estimate of steel tonnage and schedule.
- Phone +886-4-768-8550
- Address彰化縣秀水鄉番花路 300 巷 30 號 1 樓
- HoursMon–Fri 08:00–17:00 (Taiwan time, GMT+8)
- Tax ID28494320