English
Chat on LINE

08 / FABRICATION

Guangda New Build

Guangda New Build|Completed
Guangda New Build|Floor slab rebar mesh along the exterior wall, with service pipes already standing
Guangda New Build|Looking up at the steel framing above the main door opening, and the roller shutter motor
Guangda New Build|Close-up of a steel column beside the main door and the bottom of the door frame
01 / 04
Completed

A new steel factory. The steel columns and corrugated walls are up, and rebar mesh for the floor slab is being laid inside and along the walls.

Project notes

A new steel factory. In the photos, the steel columns and corrugated metal wall cladding are already up, with windows left in the walls; rebar mesh is laid on the ground inside and along the exterior walls, with service pipes left in place. There are also close-ups of the main door opening, showing the steel members around the door frame and the roller shutter motor above.

Need a steel structure of a similar scale?

Tell us your site location, intended use and floor area. Within two working days we will reply with a preliminary estimate of steel tonnage and schedule.

  • Phone +886-4-768-8550
  • Address彰化縣秀水鄉番花路 300 巷 30 號 1 樓
  • HoursMon–Fri 08:00–17:00 (Taiwan time, GMT+8)
  • Tax ID28494320