Zhangtai Section Parking Lot





A steel carport for a parking lot, documented from digging the foundations and positioning the anchor bolts to erecting the columns and beams, building the roof and marking out the parking spaces.
Project notes
Steel carport for the Zhangtai Section parking lot. In the foundation stage, foundation pits were dug along the parking spaces, anchor bolt sets were placed in the pits and held in position with angle frames, and then concrete was poured. The main structure is rows of H-beam columns and beams, and in the photos workers are still working on the roof. In other photos the asphalt paving is complete, and workers are painting the white lines of the parking spaces under the carport.
Need a steel structure of a similar scale?
Tell us your site location, intended use and floor area. Within two working days we will reply with a preliminary estimate of steel tonnage and schedule.
- Phone +886-4-768-8550
- Address彰化縣秀水鄉番花路 300 巷 30 號 1 樓
- HoursMon–Fri 08:00–17:00 (Taiwan time, GMT+8)
- Tax ID28494320