01 / CUSTOM PLANT
Lukang Parking Lot


Completed
A steel canopy for a parking lot, with H-beam columns and cross beams erected along the edge of the site. The photo was taken during erection.
Project notes
This is a steel canopy for a parking lot. The structure uses H-beam columns with cross beams and bracing, lined up along the edge of the site, and some bays already have C-section purlins in place. When the photo was taken the site was still at the erection stage, with members being lifted into place by a truck-mounted crane. The roof had not been laid, and the ground was still bare earth after grading.
Need a steel structure of a similar scale?
Tell us your site location, intended use and floor area. Within two working days we will reply with a preliminary estimate of steel tonnage and schedule.