08 / FABRICATION
Jinxing Steel Fabrication Project





The lattice steel frame exposed after an old factory's roof was removed, and lattice trusses being welded and assembled in the factory.
Project notes
Lattice steel frame work for a factory building, with photos in two parts. The first is the old factory site: the roof has been removed, leaving only the lattice columns and trusses standing on concrete columns and walls; workers climb the steel frame to work, and removed roofing material is piled on the ground. The second is fabrication in the factory: lattice trusses are welded and assembled on steel supports on the floor, next to a drill press and an overhead crane.
Need a steel structure of a similar scale?
Tell us your site location, intended use and floor area. Within two working days we will reply with a preliminary estimate of steel tonnage and schedule.
- Phone +886-4-768-8550
- Address彰化縣秀水鄉番花路 300 巷 30 號 1 樓
- HoursMon–Fri 08:00–17:00 (Taiwan time, GMT+8)
- Tax ID28494320