06 / FARM
New Pig House and Factory for Jinxing





Completed
A livestock facility and a factory built at the same time on the same site, two structures with entirely different span and clear height requirements.
Technical highlights
- Two buildings at once — The pig house and the factory were completed in a single project, with different approaches to ventilation and clear height.
Project notes
A new pig house and factory for Jinxing, carried out from January 2021.
Livestock facilities have different structural requirements from an ordinary factory: ventilation and washing are constant, so the corrosion protection standard for the steel has to rise accordingly, and the spans and clear heights are worked back from the animal circulation.
Need a steel structure of a similar scale?
Tell us your site location, intended use and floor area. Within two working days we will reply with a preliminary estimate of steel tonnage and schedule.
- Phone +886-4-768-8550
- Address彰化縣秀水鄉番花路 300 巷 30 號 1 樓
- HoursMon–Fri 08:00–17:00 (Taiwan time, GMT+8)
- Tax ID28494320