English
Chat on LINE

01 / CUSTOM PLANT

Zhangtai Parking Lot

Zhangtai Parking Lot|Completed
Zhangtai Parking Lot|Wheel stops at the end of the parking bays, and a wire mesh fence
01 / 02
Completed

Steel fabrication and installation for a parking lot. The photos show steel columns lined up along one side of the bays, and marked parking spaces.

Project notes

Steel fabrication and on-site installation for the Zhangtai parking lot. The photos show steel columns lined up along one side of the parking bays, next to asphalt spaces marked with white lines; wheel stops are set at the end of the bays, and a wire mesh fence separates the lot from the open ground outside. The photos show the parking lot already in use, and the details of the roof structure cannot be seen.

Need a steel structure of a similar scale?

Tell us your site location, intended use and floor area. Within two working days we will reply with a preliminary estimate of steel tonnage and schedule.

  • Phone +886-4-768-8550
  • Address彰化縣秀水鄉番花路 300 巷 30 號 1 樓
  • HoursMon–Fri 08:00–17:00 (Taiwan time, GMT+8)
  • Tax ID28494320