New Century Steel Fabrication

New Century Steel Fabrication|The erected frame and roof safety netting, with the crane still working
New Century Steel Fabrication|Completed
New Century Steel Fabrication|A crane lifts a steel column while workers align it on the pier
New Century Steel Fabrication|Piers and anchor bolts in place, with steel beams on the ground waiting to be lifted
New Century Steel Fabrication|Close-up of a column base plate, stiffeners and anchor bolt nuts
01 / 05
The erected frame and roof safety netting, with the crane still working

An erection record of a galvanized H-beam frame: steel columns lifted one by one onto concrete piers, with safety netting strung under the roof purlins.

Project notes

Fabrication and erection of a galvanized steel frame. The main structure is H-beam columns and steel beams. The column bases are fixed to concrete piers with base plates, stiffeners and anchor bolts, and the walls have girts and cross bracing. The photos record the erection stage: a crane lifts the steel columns one by one onto the piers, safety netting is strung under the roof purlins of the sections already up, and members waiting to be lifted are still stacked on the ground.

Need a steel structure of a similar scale?

Tell us your site location, intended use and floor area. Within two working days we will reply with a preliminary estimate of steel tonnage and schedule.

  • Phone +886-4-768-8550
  • Address彰化縣秀水鄉番花路 300 巷 30 號 1 樓
  • HoursMon–Fri 08:00–17:00 (Taiwan time, GMT+8)
  • Tax ID28494320