07 / LEGALIZATION
Liming Fireproofing



Wall fireproofing in an existing steel building, with yellow insulation boards laid along the walls and then closed in with white metal interior wall panels.
Project notes
Fireproofing for an existing steel building. The space in the photos is made up of H-beam columns and beams with C-section purlins, with cross tie rods under the roof. The work involved laying yellow insulation boards along the walls and then closing the walls in with white metal panels. The photos record the boards being laid and the interior wall panels in place, plus a close-up of a metal tray filled with insulation.
Need a steel structure of a similar scale?
Tell us your site location, intended use and floor area. Within two working days we will reply with a preliminary estimate of steel tonnage and schedule.
- Phone +886-4-768-8550
- Address彰化縣秀水鄉番花路 300 巷 30 號 1 樓