English
Chat on LINE

07 / LEGALIZATION

Shisheng New Plant Renovation

Shisheng New Plant Renovation|Completed
Shisheng New Plant Renovation|Renovation work
Shisheng New Plant Renovation|Replacing the corrugated wall cladding
Shisheng New Plant Renovation|Roof work
Shisheng New Plant Renovation|Site record
01 / 05
Completed

In renovating an existing factory, what takes the most time is not the construction but deciding which existing members can stay and which must be replaced.

Technical highlights

  • Records from before the repairs — We kept a full set of photos of the conditions before the repairs, making this one of the few projects where before and after can be compared directly.

Project notes

Renovation of the existing factory building at Shisheng’s new plant, carried out from March to June 2022.

The biggest difference between renovation and new construction is assessing existing conditions: how badly the existing steel is corroded, where the roof leaks actually come from, and whether the sheet fasteners still hold all have to be checked before the scope can be set. A wrong call does not just cost more money; it means the problem is still there after the renovation.

We kept a full set of photos of the conditions before the repairs.

Need a steel structure of a similar scale?

Tell us your site location, intended use and floor area. Within two working days we will reply with a preliminary estimate of steel tonnage and schedule.

  • Phone +886-4-768-8550
  • Address彰化縣秀水鄉番花路 300 巷 30 號 1 樓
  • HoursMon–Fri 08:00–17:00 (Taiwan time, GMT+8)
  • Tax ID28494320