English
Chat on LINE

07 — LEGALIZATION

Factory Legalization

As-built survey and reverse modeling first, then strengthening, extensions and building permits

Factory Legalization 18 projects

Factory Legalization: FAQ

FAQ
Can an old factory be legalized?
It depends on its condition. We start with an as-built survey and reverse modeling to decide which existing members can stay and which must be replaced, then plan strengthening and any extension or reduction, and help obtain the building and occupancy permits.
When rebuilding an old factory, can demolition and permitting run in parallel?
Yes, but how much to demolish and how much to keep must first match the scope of the permit application: demolish too much and parts that were legal need new permits; demolish too little and the new structure cannot connect. The Taihua factory rebuild planned demolition and permitting together. See this project: Taihua Factory Rebuild and Legalization →