07 / LEGALIZATION
Xielong Factory New Build and Repairs





Completed
A small urban site: when the steel columns were erected, there were existing buildings and roads on three sides.
Technical highlights
- Back for repairs after the new build — Built in 2017, then we went back for repairs in 2024. The same client came back to the same contractor seven years later.
Project notes
A factory project for Xielong, newly built in 2017, with a return visit for repairs in 2024.
The photos show the site is in town, hemmed in by existing buildings and roads on three sides. On a site like this, crane positions and the erection sequence must be planned in advance, and there is very little room to adjust on the spot.
Need a steel structure of a similar scale?
Tell us your site location, intended use and floor area. Within two working days we will reply with a preliminary estimate of steel tonnage and schedule.