English
Chat on LINE

07 / LEGALIZATION

Yixing Plant Site Project

Yixing Plant Site Project|Completed
Yixing Plant Site Project|Main works on the plant site
Yixing Plant Site Project|Boiler room
Yixing Plant Site Project|Carport
Yixing Plant Site Project|Site record
01 / 05
Completed

Within one plant site, the main building, boiler room, carport and boundary wall were contracted as separate items, and the source of leaks in the existing roof also had to be dealt with.

Technical highlights

  • Several work items in parallel — The project subfolders show that besides the main works there was also work on a boiler room, a carport, the south boundary wall and the heat-setting area.

Project notes

Multiple works on the Yixing plant site. Besides the main building, they included a boiler room, a carport, the south boundary wall, and tracing and repairing the cause of leaks in the existing roof.

The hard part of a roof leak is finding the source. Where the water gets in and which purlin it runs along are often not the same place as where it finally drips down.

Need a steel structure of a similar scale?

Tell us your site location, intended use and floor area. Within two working days we will reply with a preliminary estimate of steel tonnage and schedule.

  • Phone +886-4-768-8550
  • Address彰化縣秀水鄉番花路 300 巷 30 號 1 樓
  • HoursMon–Fri 08:00–17:00 (Taiwan time, GMT+8)
  • Tax ID28494320